GST on Under-Construction Property in Himachal (2026): 1% or 5%, Ready Flats, Plots and the ₹45 Lakh Test

Short answer (seedhi baat)

  • Under-construction residential apartments sold by a promoter: from 1 April 2019 the official GST Council FAQ states the effective rates, after deduction of the value of land, as 1% without input tax credit on total consideration for an affordable residential apartment, and 5% without input tax credit on total consideration for other residential apartments.[1][2] The FAQ is guidance; the gazette notification is the law.[1]
  • Affordable is a tight test, not a marketing word. You need both: carpet area not more than 90 square metres in towns that are not on the official metropolitan list, and a gross amount charged of not more than ₹45 lakh.[1][2] Kasauli, Dharampur, Kandaghat, Solan, Chail and Shimla are not on that metro list.[2]
  • The 1% / 5% entries do not apply where the entire consideration is received after the completion certificate (where required) or after first occupation, whichever is earlier.[2]
  • Sale of a plot, including a developed plot with levelling or drainage, water and electricity lines, does not attract GST. A development service billed on its own can.[4]
  • GST is not stamp duty, not registration, not TDS, and not Section 118. Budget them separately. stamp duty and registration guide · TDS on buying property guide · Section 118 guide

This is the tax question people actually ask when they book a villa or flat around Kasauli, Dharampur, Kandaghat, Solan or Shimla, or when they compare a plot with an under-construction unit. It is a central and State GST question, not a special Himachal rate.

1. When GST applies — and when it does not

People use “under-construction”, “ready to move” and “OC/CC aa gaya hai” loosely. The official rate entries are tighter than that.

Notification No. 03/2019-Central Tax (Rate), which amended the main rate notification from 1 April 2019, applies the residential construction rates to construction of apartments by a promoter, intended for sale to a buyer, wholly or partly, except where the entire consideration has been received after issuance of the completion certificate, where required, by the competent authority, or after its first occupation, whichever is earlier.[2]

So the practical questions to ask, before you pay a token, are:

A board that says “ready to move”, or a walk-through of a show unit, is not the certificate. Ask for the document.

2. The 1% and 5% rates (from 1 April 2019)

The official GST Council FAQ of 7 May 2019, written after the new real-estate rate structure was notified, puts the effective rates like this:[1]

Those rates apply to projects that commence on or after 1 April 2019, and also to on-going projects, unless the promoter of an on-going project had opted, in the window given in 2019, to stay on the old effective 8% / 12% rates with input tax credit.[1] For a project that started after 1 April 2019 there was no such option: the FAQ says the new 1% or 5% rates without ITC apply compulsorily.[1]

Why “effective” and “after deduction of the value of land”? The rate notification does not tax the land. Paragraph 2 of Notification No. 11/2017-Central Tax (Rate) treats the value of the transfer of land, or of an undivided share of land, as deemed to be one third of the total amount charged. The taxable value of the construction service is the total amount minus that deemed land value.[3] “Total amount” is the consideration for the construction service plus the amount charged for the land transfer, including a lease or sub-lease.[3]

The official FAQ is blunt on one buyer-facing point: the promoter cannot replace that deemed one-third with the “actual” value of the land.[1] So a brochure that says “land is billed separately, so GST should be lower” is not how the notification works.

The 1% and 5% figures are therefore effective rates on the total consideration, after that land abatement. Input tax credit is not available on these new-rate residential supplies.[1][2]

3. The affordable test in these hills

Both of the following must be true:[2][1]

The metropolitan cities named in the notification are Bengaluru, Chennai, Delhi NCR limited to Delhi, Noida, Greater Noida, Ghaziabad, Gurgaon and Faridabad, Hyderabad, Kolkata, and Mumbai (whole of MMR).[2][1] Kasauli, Dharampur, Kandaghat, Solan, Chail and Shimla are not on that list, so the carpet-area cap here is 90 square metres, not 60.

Gross amount is wider than a “base price”. The notification adds up (A) the consideration for the construction service, (B) the amount charged for the land or undivided share of land, including a lease or sub-lease, and (C) any other amount the promoter charges the buyer, including preferential location charges, development charges, parking charges and common-facility charges.[2]

That is why most villas, and many larger apartments, offered around these towns will fall on the 5% side if they are still under construction. A project advertised from ₹1 crore, or ₹4.5 crore, is already above ₹45 lakh. We do not assign a GST rate to any named project on this page; that depends on the unit, the dates, and the invoice.

4. Plots, developed land, and building on your own land

If you are buying land, the starting point is Schedule III of the CGST Act, as quoted in a CBIC circular of 3 August 2022: sale of land is neither a supply of goods nor a supply of services, and so does not attract GST.[4]

The same circular, issued after the 47th GST Council meeting, answers the follow-up buyers actually ask: what if the plot has already been levelled, or already has drainage, water or electricity lines? It clarifies that sale of such developed land is also sale of land and does not attract GST.[4]

What can attract GST is a service of developing land — levelling or laying lines, for example — billed as a service, at the rate applicable to that service.[4] So if a seller’s invoice splits “plot” and “development charges” as a service, have that service line checked. If the papers are simply a sale of the plot, GST is not added because the roads exist.

Building a house through a contractor on a plot you already own is not the same supply as buying an under-construction apartment from a promoter. The 1% / 5% figures above are for the promoter’s sale of apartments in a real estate project.[1][2] We have not restated a current works-contract rate for a single house in these towns, because the 56th GST Council’s September 2025 decisions changed rates on many goods and some services — including a cut in GST on cement from 28% to 18% — and we have not opened a gazette that maps the contractor rate you would pay in Solan or Shimla today.[5] Ask for the rate on the contractor’s invoice.

The Himachal land checks (jamabandi, rasta, Section 118, demarcation) still apply when you buy a plot, GST or no GST. Kasauli land and plot guide · Section 118 guide

5. Commercial units, and what did not change in September 2025

Shops, offices or godowns in a project are not automatically “12%”. The official FAQ splits them:[1]

On 3 September 2025 the GST Council (56th meeting) recommended a wide rate rationalisation. The official press release lists, among other changes, a reduction of GST on cement from 28% to 18%.[5] In that press release we did not find a recommendation that changes the 1% or 5% effective rates on construction of residential apartments. The figures we quote remain those in the 2019 FAQ and in Notification No. 03/2019-Central Tax (Rate). We have not seen a later gazette amending those particular residential entries. Always read the rate on the tax invoice.

6. GST is not the rest of your bill

Buyers in these towns sometimes add up only the GST and forget the State and income-tax costs, or the other way around:

If you are taking a home loan, the bank will have its own list; GST on the construction invoices is one document among others. home loan guide

7. What to ask the promoter (and what we will not invent)

  1. Is any consideration being taken before the completion certificate or first occupation? Ask for the certificate, with the date.
  2. Which rate is on the tax invoice — 1% or 5% (or another notified rate) — and is the price inclusive of GST or plus GST?
  3. What carpet area and what gross amount (including parking, PLC and other charges) are being used for the affordable test?
  4. The promoter’s GSTIN, and the HP RERA registration of the project. HP RERA check guide
  5. If it is a plot: is this only a sale of land, or is a development or construction service being billed separately?

We will not invent a GST rate for a named villa or apartment project, a timeline for a completion certificate in the Kasauli or Solan tehsil, or a rule that GST goes up or down because you are not a Himachali. If a fact is not in the official sources listed below, it is not on this page.

FAQs (aksar pooche jaane wale sawal)

Under-construction villa ya flat pe GST kitna hai?
From 1 April 2019, the official GST Council FAQ states the effective rates, after deduction of the value of land, as 1% without input tax credit on total consideration for an affordable residential apartment, and 5% without input tax credit on total consideration for other residential apartments. Those figures are guidance; the gazette notification is the law. The rates apply to construction by a promoter of apartments intended for sale, unless the entire consideration is received after the completion certificate (where required) or after first occupation, whichever is earlier. Most villas and larger flats around Kasauli, Dharampur, Kandaghat, Solan and Shimla will not meet the affordable test, so the 5% figure is the one to budget unless the promoter shows that both the carpet-area and the ₹45 lakh conditions are met.
Affordable wala 1% Kasauli, Solan ya Shimla mein kab milta hai?
Two conditions must both be met, not just one. Carpet area must not exceed 90 square metres in cities or towns other than the listed metropolitan cities, and the gross amount charged must not be more than ₹45 lakh. The official metropolitan list is Bengaluru, Chennai, Delhi NCR (only Delhi, Noida, Greater Noida, Ghaziabad, Gurgaon and Faridabad), Hyderabad, Kolkata and Mumbai (whole of MMR). Kasauli, Dharampur, Kandaghat, Solan, Chail and Shimla are not on that list, so the 90 square-metre test applies here, not the 60 square-metre metro test. Gross amount is not only the 'base price': it includes the land transfer and other amounts the promoter charges you, such as preferential location, development, parking and common-facility charges. A ₹2 crore or ₹4.5 crore villa is not affordable housing for this rate, whatever the carpet area.
Ready-to-move flat pe GST lagta hai kya?
The official test is not the brochure word 'ready to move'. The rate entries do not apply where the entire consideration has been received after issuance of the completion certificate, where required, by the competent authority, or after first occupation, whichever is earlier. If even part of the price — a token, an instalment, or the booking amount — was taken before that date, you are not in the 'entire consideration after' exception. Ask for the completion certificate (or the first-occupation document) and match the dates with every payment you have made or will make. First occupation, the official FAQ says, means first occupation of the project in accordance with the applicable laws and rules, not an informal 'someone has already moved in'.
Plot kharidne pe GST lagta hai?
Sale of land does not attract GST. A CBIC circular of 3 August 2022, issued after the 47th GST Council meeting, also clarifies that land sold after some development — levelling, or laying drainage, water or electricity lines — is still sale of land and does not attract GST. What can attract GST is a separate development service (for example levelling or laying lines billed as a service). If a 'plot' package quietly includes construction of a villa, that construction is a different question. Read the agreement and the invoice, and use our Kasauli land and plot guide for the Himachal land-buying checks.
GST price mein included hai ya extra?
The official FAQ and the rate notification state the effective rate on total consideration; they do not tell you whether a particular brochure price is tax-inclusive. Ask the promoter, in writing, for a tax invoice that shows the consideration, the GST rate applied (1% or 5%, or another notified rate), the GST amount and the promoter's GSTIN. Do not assume a 'all-inclusive' headline price has already added GST.
Token ya bayana pe bhi GST?
The official exception is only for a case where the entire consideration is received after the completion certificate or first occupation. A token, bayana or booking amount paid before that date is part of the consideration for the construction service, not a separate kind of tax-free payment. How the promoter invoices that instalment is a question for the tax invoice. A token also does not transfer title; that is covered in our agreement to sell vs sale deed guide. The RERA 10% cap on advances is a different rule from GST.
Stamp duty ke alawa GST bhi dena padega?
Yes, they are different levies. GST, where it applies, is a tax on the construction service. Stamp duty and the registration fee are State charges on the instrument you register, and in Himachal a Section 118 permission deal is stamped at 12%. TDS under the Income-tax Act is a third, separate deduction when the price or the stamp-duty value is ₹50 lakh or more. Budget all three; none of them replaces the others. See our stamp duty and TDS guides.
Section 118 permission se GST ka rate change hota hai?
No official source we opened makes the GST rate turn on Section 118, or on being a Himachali or an agriculturist. Permission under Section 118, the 12% stamp-duty route, and GST on an under-construction unit are three separate questions. You may still need permission even if no GST is due (for example on a plot), and you may still pay GST even after permission is granted (for example on an under-construction villa).
Builder ke baad completion certificate aa gaya, ab kya?
If the entire consideration is received after the completion certificate (where required) or after first occupation, whichever is earlier, the notified 1% / 5% construction-service rates in those entries do not apply to that sale. If you already paid a token or instalments before that date, you are not in that exception just because the certificate was issued later. Ask for the certificate itself, not only a WhatsApp photo of a board that says 'ready'.
Developed plot, roads aur lights ke saath, us pe GST?
The 3 August 2022 circular says sale of land after levelling and after laying drainage, water or electricity lines is still sale of land and does not attract GST. A development service billed on its own can attract GST at the rate applicable to that service. We have not opened a later gazette that withdraws this clarification. Keep the sale deed and any development invoice separate in your file so you can see which is which.
Apni zameen pe contractor se ghar banwane pe bhi 5%?
Not as an automatic rule. The 1% and 5% figures in the official FAQ are for construction of residential apartments by a promoter in a real estate project, sold to a buyer. Hiring a contractor to build a house on a plot you already own is a different supply (a works contract). We have not restated a 2026 works-contract rate here, because the 56th GST Council's September 2025 decisions changed rates on many goods and some services (including a cut in GST on cement from 28% to 18%), and we have not opened a gazette that maps the current contractor rate for a single house in these towns. Ask the contractor for the applicable rate on the invoice, and take written advice.
September 2025 ke GST 2.0 se ye rates badal gaye kya?
The official 3 September 2025 press release on the 56th GST Council lists a reduction of GST on cement from 28% to 18%. In the text of that press release we did not find a recommendation changing the 1% or 5% effective rates on construction of residential apartments. The rates we quote are those in the 7 May 2019 official FAQ and in Notification No. 03/2019-Central Tax (Rate), in force from 1 April 2019. We have not seen a later gazette that amends those particular residential entries. Confirm the rate printed on the promoter's tax invoice.
TDS aur GST dono lagenge?
They can. GST, where it applies, is charged on the construction service. TDS on buying immovable property is a 1% deduction (for a resident seller, when the price or the stamp-duty value is ₹50 lakh or more) under the Income-tax Act, deposited on Form 141. We have not opened an official instruction on whether the 'consideration' for that TDS calculation includes the GST charged on the invoice, so do not take a figure from this page; ask a chartered accountant and follow the invoice and the Act. Details are in our TDS guide.
Project mein shop ya commercial unit ho to?
The official FAQ gives a split, not a single 'commercial is 12%' line. Construction of commercial apartments (shops, godowns, offices) in a Residential Real Estate Project — one where commercial carpet area is not more than 15% of the project's total carpet area — has an effective rate of 5% without ITC on total consideration, for a project that starts on or after 1 April 2019 or an ongoing project on the new rates. In a real estate project that is not an RREP (or an ongoing project that stayed on the old rates), the effective rate stated is 12% with ITC on total consideration. Ask which kind of project it is, and read the invoice.

Sources

  1. GST Council, F. No. 354/32/2019-TRU, 7 May 2019, 'FAQs on real estate' (official PDF opened 18 Nov 2026). The answers 'have been given in simple language for guidance' and 'do not have force of law'; 'in case of conflict, the gazette notifications, which have legal force, shall have precedence'. Q1: with effect from 01-04-2019, effective rate of GST on construction of residential apartments by promoters, after deduction of value of land, is 1% without ITC on total consideration for affordable residential apartments and 5% without ITC on total consideration for other residential apartments; the rates apply to projects commencing on or after 01-04-2019 and to on-going projects, with an option on on-going projects to stay at the old effective 8% / 12% with ITC. Q2: an affordable residential apartment (for the new 1% rate) has carpet area up to 60 square metre in metropolitan cities and 90 square metre in cities or towns other than metropolitan cities, and the gross amount charged by the builder is not more than forty five lakh rupees; metropolitan cities are Bengaluru, Chennai, Delhi NCR (limited to Delhi, Noida, Greater Noida, Ghaziabad, Gurgaon, Faridabad), Hyderabad, Kolkata and Mumbai (whole of MMR). Q5: commercial apartments in a Residential Real Estate Project (RREP) — 5% without ITC on total consideration; commercial apartments in a Real Estate Project other than an RREP (or an ongoing project on old rates) — 12% with ITC on total consideration. Q6: an RREP is a real estate project in which the carpet area of the commercial apartments is not more than 15 per cent of the total carpet area of all the apartments in the project. Q29: the term 'first occupation' appears in Schedule II paragraph 5(b) of the CGST Act and in notification No. 11/2017-Central Tax (Rate); it means the first occupation of the project in accordance with the laws, rules and regulations laid down by the Central Government, State Government or any other authority in this regard. Q36: a developer cannot take a deduction of the actual value of land; paragraph 2 of notification No. 11/2017-CTR 'clearly prescribes one-third abatement towards value of land'
  2. Notification No. 03/2019-Central Tax (Rate), 29 March 2019 (official GST Council copy opened 18 Nov 2026), amending notification No. 11/2017-Central Tax (Rate), 28 June 2017. In force from 1 April 2019. The rate entries for construction of affordable and other residential apartments by a promoter apply where the supply is intended for sale to a buyer, wholly or partly, 'except where the entire consideration has been received after issuance of completion certificate, where required, by the competent authority or after its first occupation, whichever is earlier', and the provisions of paragraph 2 of the notification apply for valuation. Paragraph 4 explanation (xvi): 'affordable residential apartment' means a residential apartment in a project which commences on or after 1 April 2019 (or in an ongoing project where the promoter has not exercised the option to pay tax at the old rates) 'having carpet area not exceeding 60 square meter in metropolitan cities or 90 square meter in cities or towns other than metropolitan cities and for which the gross amount charged is not more than forty five lakhs rupees'. Metropolitan cities listed: Bengaluru, Chennai, Delhi NCR (limited to Delhi, Noida, Greater Noida, Ghaziabad, Gurgaon, Faridabad), Hyderabad, Kolkata and Mumbai (whole of MMR). Gross amount is the sum of (A) consideration charged for the specified construction services, (B) amount charged for the transfer of land or undivided share of land, including by way of lease or sub-lease, and (C) any other amount charged by the promoter from the buyer, including preferential location charges, development charges, parking charges, common facility charges etc. 'Apartment', 'promoter' and 'Real Estate Project' take their meanings from the Real Estate (Regulation and Development) Act, 2016. A Residential Real Estate Project (RREP) is a REP in which the carpet area of the commercial apartments is not more than 15 per cent of the total carpet area of all the apartments in the REP
  3. Notification No. 11/2017-Central Tax (Rate), 28 June 2017, updated version as amended up to 1 April 2019 (official GST Council PDF opened 18 Nov 2026). Paragraph 2: for the specified construction services in serial number 3 of the Table that involve transfer of land or an undivided share of land, the value of the supply 'shall be equivalent to the total amount charged for such supply less the value of transfer of land or undivided share of land', and 'the value of such transfer of land or undivided share of land ... shall be deemed to be one third of the total amount charged for such supply'. Explanation: 'total amount' means the sum of (a) consideration charged for the aforesaid service and (b) amount charged for transfer of land or undivided share of land, including by way of lease or sublease
  4. Circular No. 177/08/2022-GST, CBIC-190354/176/2022-TRU, 3 August 2022 (official GST Council PDF opened 18 Nov 2026), issued after the 47th GST Council meeting. Paras 14.2–14.4: as per Sl. No. (5) of Schedule III of the Central Goods and Services Tax Act, 2017, 'sale of land' is neither a supply of goods nor a supply of services, therefore sale of land does not attract GST. 'Land may be sold either as it is or after some development such as levelling, laying down of drainage lines, water lines, electricity lines, etc. It is clarified that sale of such developed land is also sale of land and is covered by Sr. No. 5 of Schedule III ... and accordingly does not attract GST.' However, 'any service provided for development of land, like levelling, laying of drainage lines (as may be received by developers) shall attract GST at applicable rate for such services'
  5. Press Information Bureau / GST Council, 3 September 2025: recommendations of the 56th Meeting of the GST Council held at New Delhi (official PDF opened 18 Nov 2026). Among the rate changes listed is 'Reduction of GST from 28% to 18% on Cement'. A full-text search of this press release found no recommendation changing the 1% or 5% effective GST rates on construction of residential apartments by a promoter

This page explains official GST guidance and notifications in plain English. It is not tax or legal advice. The GST Council FAQ itself says it does not have force of law if it conflicts with a gazette notification. Confirm the rate on the tax invoice and with a chartered accountant who has your papers.

Related: stamp duty and registration guide · TDS on buying property guide · agreement to sell vs sale deed guide · HP RERA check guide · Section 118 guide · Kasauli land and plot guide · home loan guide · TCP building-rules guide · property registration (registry) guide · Himachal property facts

Last updated: · How we verify listings

Booking an under-construction home in the Solan hills? Tell us the town and how we can help

Free, no-obligation shortlist. We call you back within working hours. No spam, no sharing your number.

Get the best options for me →